1. The project and its implementation
Nestled between the ancient walls facing the sea and the row of buildings facing the mountain, the porticoed walkway was once the route that connected Porto Maurizio to Diano Marina.
In recent years, with the opening up of the dockside and the establishment of numerous restaurants, Calata Cuneo has become one of the city's most popular spots.
However, the historical and architectural values of the portico have gradually been overshadowed, also due to the numerous transformations it has undergone over time.

The portico, divided into several factory blocks, has been remodeled several times over time: rough paintwork, cement plaster, stone skirting boards inconsistent with the original layout, exposed cables, and widespread signs of damp have gradually obscured its character.
The project involves the entire gallery, including vaults, walls, pillars and stone flooring , through a series of targeted interventions.
- Surface restoration: removal of old paint and loose parts, repair of plaster with mortars based on natural hydraulic lime and sand similar to the original, final painting with lime glaze.
- Skirting boards and damp: Apply a lime-based plaster coat to prevent rising damp and remove non-original stone skirting boards.
- Historical colors: definition of the shades for factory blocks based on stratigraphic tests, in agreement with the Superintendency.
- Systems and flooring: Eliminate, where possible, exposed cables and repair damaged sections of the stone slab flooring, recovering the existing slabs.
- Metalwork and lighting: restoration of metal chains and painting of ceiling light fixtures.
- Green areas and rest areas: installation of Corten steel basins planted with native and Mediterranean species, integrated lighting, and seating made of wood from certified forests.
- Exhibition spaces: use of existing chains, arches, and mobile easels to house paintings, photographs, and sculptures, without interfering with the historic structures.
The executive project, authorized by the Superintendency with protocol 10300/25 of 09/26/2025 , was approved with Management Determination n. 1370 of 07/30/2026 .
The works were awarded to Avalis Costruzioni srl of Bagnolo Piemonte (CN), delivered on September 28, 2026 , and are currently underway. Completion is scheduled for May 29, 2027 .
2. Project objectives
The restoration and redevelopment of the ancient walls of the Calata Cuneo porticoes restore value and decor to one of the city's most iconic locations.
The project aims to expand the functions of the portico, currently mainly commercial, transforming it into an exhibition gallery and a place for meeting and cultural exchange .
The project involves schools, particularly the Art Institute, which will provide an exhibition space for young artists, with shows dedicated to the sea, the city, local history, and sustainability.
Particular attention is paid to the circular economy : the works on display may be born from the creative reuse of waste materials, also as a tribute to Giulio Natta , Nobel Prize winner in Chemistry born in Imperia.
A greater variety of functions will help make the area more attractive and resilient, strengthening the connection between historical heritage, culture, economic activities and community.
3. Before the works
The images document the condition of the porticoes before the restoration work began, highlighting the deterioration of the plaster, the uneven paintwork, and the condition of the historic surfaces.


4. The construction site and ongoing work
The photographic documentation illustrates the main stages of the construction site's progress, from surface preparation to the restoration of the original walls, up to the restoration of the plaster and stone floors.










Photographic documentation relating to the restoration and redevelopment of the porticoes of Calata Cuneo.
5. Investment and financing
The overall economic framework of the intervention is financed by the Liguria Regional Programme ERDF 2021-2027 , OP 5 - Action 5.1.1, "Territorial strategies for sustainable development in medium-sized urban areas".
The project is part of the "Culture, Territory, Sustainability - Living the Future Together" Territorial Strategy for the central urban area of Imperia, co-financed by the European Union and the municipal administration.
The investment contributes to the restoration of the city's historical and architectural heritage, the improvement of public spaces, and the cultural and touristic development of the city.
6. Project references
Authorization from the Superintendency: ref. 10300/25 of 26/09/2025.
Approval of the executive project: Management Resolution No. 1370 of July 30, 2026.
Work is currently underway and proceeding in successive sections, marked and signposted. We thank residents, businesses, and visitors for their patience and cooperation.